Travel Information

View construction legend
  • Sidewalk Closure
  • Shoulder Closure
  • Road Closure
  • Ramp Closure
  • Lane Shift
  • Lane Closure
  • Emergency
  • Detour
  • Construction Zone
  • Utility Work
  • Sound Wall Construction
  • Sign Installation
  • Sidewalk Work
  • Shared Use Path
  • Roadway Stripping
  • Roadway Base Installation
  • Retaining Wall Construction
  • Pedestrian Bridge Construction
  • Paving
  • Landscaping
  • Intersection Work
  • Highway Lighting
  • Guardrail Work
  • Foundation Drilling
  • Excavation
  • Drainage Work
  • Clearing
  • Bridge Construction
Toggle Traffic Fullscreen
7/19/2018 - 8/31/2018

Crews are widening FM 1626 between Big Valley Drive and Lakewood Drive and adding traffic signals for the new intersection with the SH 45SW toll road.

More >

Crews are working on the new intersection between FM 1626 and the SH 45SW toll road.

More >
7/19/2018 - 8/31/2018

Traffic shift to accommodate construction of flyover ramps to SH 45SW toll road

More >

Crews are constructing flyover ramps to connect State Loop 1 and SH 45 with the new SH 45SW toll road.

More >
7/19/2018 - 8/31/2018

Work is ongoing to complete an interchange between the SH 45SW toll road and Bliss Spillar Road

More >

Crews are constructing the SH 45SW bridge over Bliss Spillar Road and are constructing access ramps to and from the north. They are also realigning Bliss Spillar Road and constructing a bicycle and pedestrian trail head with a parking lot.

More >
7/24/2018 - 7/24/2018

On Tuesday, July 24, there will be a traffic shift into the center lane on northbound FM 1626 from Lewis Lane to Big Valley Drive. The lane closure and shift is from 9 AM to 4 PM.

More >

Construction crews are placing illumination poles along NB FM 1626.

More >

Short Term

7/24/18 to 7/24/18
Lane Closure and Traffic Shift on Northbound FM 1626 on 7/24
Lane Shift | Sign Installation

Lane Shift
On Tuesday, July 24, there will be a traffic shift into the center lane on northbound FM 1626 from Lewis Lane to Big Valley Drive. The lane closure and shift is from 9 AM to 4 PM.

Sign Installation
Construction crews are placing illumination poles along NB FM 1626.

Long Term

7/19/18 to 8/31/18
Lane Reduction and Traffic Shift on FM 1626
Lane Shift | Intersection Work

Lane Shift
Crews are widening FM 1626 between Big Valley Drive and Lakewood Drive and adding traffic signals for the new intersection with the SH 45SW toll road.

Intersection Work
Crews are working on the new intersection between FM 1626 and the SH 45SW toll road.

7/19/18 to 8/31/18
Flyover Ramp Construction on Loop 1 at SH 45SW
Construction Zone | Bridge Construction

Construction Zone
Traffic shift to accommodate construction of flyover ramps to SH 45SW toll road

Bridge Construction
Crews are constructing flyover ramps to connect State Loop 1 and SH 45 with the new SH 45SW toll road.

7/19/18 to 8/31/18
Interchange Construction at Bliss Spillar Road
Construction Zone | Intersection Work

Construction Zone
Work is ongoing to complete an interchange between the SH 45SW toll road and Bliss Spillar Road

Intersection Work
Crews are constructing the SH 45SW bridge over Bliss Spillar Road and are constructing access ramps to and from the north. They are also realigning Bliss Spillar Road and constructing a bicycle and pedestrian trail head with a parking lot.